At Oval Projects, we are proud to showcase a diverse portfolio of completed projects across the Oil & Gas, and Power sectors. Each project reflects our commitment to excellence, safety, and innovation, demonstrating our ability to deliver high-quality infrastructure solutions tailored to meet specific client requirements. With a dedicated team of professionals and an unwavering focus on precision, we have successfully executed projects that set new benchmarks in the industry.
Our completed projects demonstrate our expertise in infrastructure development and our commitment to quality, safety, and sustainability. We take pride in each accomplishment, delivering solutions that enhance operations, meet regulatory standards, and exceed client expectations. At Oval projects, we look forward to creating more successful projects and helping our clients achieve their infrastructure goals.
Explore Our Completed Projects
Sr. No. | Project Name | Project Description | Client |
---|---|---|---|
1 | Revamping of new flare at Rokhia GCS | Construction ot flare of capacity 0.5 MMSCMD of’ natural gas at Rokhia GGS | ONGC |
2 | Gas Flare facility of Sonamura GCS | supply & installation of gas flaring facility of phase 11 of sonamura GCS & Pipeline project. Residual engineering, procurement. fabrication. construction. erection, hook-up. testing. pre-commissioning and commissioning of flare package. storage system. fuel gas system. & fire fighting system | ONGC |
3 | Crirtical Works for safe operation of process train | EPC | ONGC |
4 | Civil and Mechanical Works at Sonamura GCS | Cir il and Mechanical Works at Sonamura GCS (0.8 MMSCMD gas processing train) | ONGC |
5 | Supply Installation and commission of well side BK 1 | EPC | ONGC |
6 | Methanol Gantry Works | EPC | APL |
7 | Construction of Barrack Accommodation for Security Personnel at Agartala | Composite works (civil. mechanical & Electrical) for construction of CNG station at Chandra pur ISBT. | TNGCL |
8 | Construction of’C&P store shed in front of Gail | construction of C&P store shed in front of‘Anandnagar terminal of GAIL, Agartala | GAIL |
9 | Gojalia GCS Boundary wall | Gojalia GCS. SH-2. Construction of RCC boundary wall with concertina coil fencing (Kalimandir to opposite railway side) | ONGC |
10 | Trishna EPS | Civil & associated works fro Trisna Surface Facilities under LSTK tender | ONGC |
11 | Construction of classroom at ONGC Colony KVS | Civil Works | ONGC |
12 | MBB College Pond Development | Civil Works | Agartala Smart City Ltd |
13 | Modification of conference room and boundary wall | Civil Works | GAIL |
14 | lnnovative Use of Water Body at Dimsagar Pond | Civil Works | Agartala Smart City Ltd |
15 | Pilling work at Teliamura CNG Station | Civil Works | TNGCL |
16 | Construction of 10 natural gas pipeline -sonamura gcs to monarchak terminal | Construction of 10 natural gas pipeline -sonamura gcs to monarchak terminal | Mahi construction |
17 | Balance minimum jobs for layering of 20 inch gas pipeline( ADB TO Baramura GCS) | Part-3 of Phase 11 of Sonamura GCS & Pipeline Project | DCPL |
18 | Replacemant of section of 4 inch MS pipe inside Neepco Plant | Pipeline | WGCL |
19 | HDD work for layering pipes across gomti river including supply of consumables & coaring sleeves | Pipeline | Vichitra Construciton ’“'’ Ltd. |
20 | Installation and lay ing of Pipeline and Station Works for Aishwariya Barmer Hill Project for Rajasthan | Pipeline | CAIRN |
21 | Laying of Pipeline 10" x 58 Km | 1ai'ing of’ 10 x 58 Km FiC gas pipeline from Gojalia GCS to Palatana Pipeline project. ONGC Tripura. | MEIL |
22 | Laying of 3LPE Coited Carbon Steel Pipelineln Group B2 Bokaro GA | Pipeline | IOCL |
23 | O&M worL for existing PE and Steel pipeline | Pipeline | TNGCL |
24 | GI installation for city gas distribution | Pipeline | TNGCL |
25 | Laying of 8"X8.5km approx. Gas pipeline Trishna pipeline | Pipeline | ONGC |
26 | Laying and Construction ot'stee1 pipeline work and associate work | Laying & construction of 10 NBx 5 Km. 6 NBx 9 Km & 4 NB x 1 Km underground steel pipe line netu'ork & associated work from AB Road to Bhabha Nagar to Panchayati to Peth Road and Laying up to Sinner & Surrounding areas for CGD project of Nashik GA | MNGCL |
27 | Laying and Construction of steel pipeline work and associate work | Laying & construction of 10 NBx 5 Km. 6 NBx 8 Km & 4 NB x 2 Km underground steel pipe line nets ork & ass'ociated work from pappaya nursery chowk to Sharanpur road. Hotel tapou an to CIDCO to Prashant Nagar to Pathrdi Phata to Muktidham Road & Surrounding areas for CGD project ot’Nashik GA. | MNGCL |
28 | Laying and Construction o1'steel pipeline work and associate work | CGD project of Ramanagara GA for MNGL. | MNGCL |
29 | Laying, hook-up and commissioning of Reinforced Thermoplastic Pipe (RTP) lines | Pipeline | ONGC |
30 | Export Oil Tank Modification work at MTP | Pipeline | CAIRN |
31 | Replacement of corroded deck plates. stairs and railings in processs area of ADB GCS | supply and replacing the corroded chequered plates, staircase steps, railings, corroded structure of process platforms and vessel platforms and extension of process deck on second floor in ADB GCS process area. | ONGC |
32 | Laying testing and commissioning of SS tube for DBS at Bishalgarh in IOCL RO | Modification Of Tank | TNGCL |
33 | Site Management sonamura GCS and pipeline | ONGC |
|
34 | Hiring of’ Mahindra Bolero | Hiring of on no. of mahindra bolero camper & one no. of mahindra bolero services for one year | DCPL |
35 | Transportation of steel and structural materials and construction goods | Site Management | Speed Cargo Carriers |
36 | CGD project of TNGCL (606) | Hiring of 3 no. of LCV for CNG transportation for CGD project of TNGCL | TNGCL |
37 | CGD project of TNGCL (6012) | Hiring of 1 no. of’ LCV for CNG transporation for CGD project of TNGCL | TNGCL |
38 | CGD project ot TNGCL (601) | Hiring of 2 no. of LCV for CNG transportation for CGD project of TNGCL | TNGC L |
39 | Revamping of new flare at Rokhia GCS | Hiring of 1 no. of LCV tor CNG transporation for CGD project of TNGCL | TNGCL |
40 | CGD project of TNGCL (609) | Hiring of 1 no. of LCV for CCG transporation for CGD project of TNGCL | TNGCL |
41 | CGD project of TNGCL (6025-N) | Hiring ot" l no. of LCV tor CNG transporation for CGD project of TNGCL | TNGCL |
42 | Kammapalem site | Hiring of 125 KVA Diesel generator set | OGSP Cutter Process Solutions India Pvt. Ltd. |
43 | Barrack Accommodation for Security Personnel at Agartala | LPlA |